Home Calculator States & DISCOMs Blog
Uttar Pradesh Official Tariff: Active for 2026 (Valid till 2027) Billing Cycle: Monthly (30 Days)

UPPCL Electricity Bill Calculator 2026 – UP Uniform DISCOM Estimator

Electricity distribution across Uttar Pradesh is administered by UPPCL through five regional operating companies: PVVNL (Western UP / Meerut / Noida), MVVNL (Central UP / Lucknow), DVVNL (Southern UP / Agra), PuVVNL (Eastern UP / Varanasi), and KESCO (Kanpur). All five utilities operate under a unified retail tariff schedule regulated by the Uttar Pradesh Electricity Regulatory Commission (UPERC). The state structure draws a clear distinction between Urban Domestic (LMV-1c) and Rural Domestic (LMV-1b) consumers. Urban households pay fixed demand charges of ₹110 per kilowatt alongside progressive energy slabs ranging from ₹5.50 to ₹7.00 per unit, plus a statutory 5% UP state electricity duty. Rural consumers benefit from lower fixed charges of ₹50 per kilowatt and lower base energy rates. This calculator applies official UPERC gazetted tariff orders to produce exact slab breakdowns for homes and businesses across Uttar Pradesh.

🏛️
UPERC Official Tariff Order & Validity Status Active in 2026 (Valid till 31 March 2027)
Annual Tariff & ARR (Zero Hike / Existing Rates Retained)

UPERC retained existing tariff schedule with zero hike for FY 2026-27. Domestic Urban LMV-1(c), Domestic Rural LMV-1(b), BPL Lifeline LMV-1(a) <=100u, and Commercial LMV-2 with tiered connected load slabs. Applicable uniformly across PVVNL, MVVNL, DVVNL, PuVVNL, and KESCO.

Regulatory Commission Uttar Pradesh Electricity Regulatory Commission
Order / Gazette No UPERC Tariff & ARR Order FY 2026-27 (Petition No. 2026/2024)
Effective Date 2 July 2026
Legally Valid Until 31 March 2027
Uniform 5-DISCOM Jurisdiction: The exact same UPERC retail tariff applies uniformly across PVVNL (Meerut), MVVNL (Lucknow), DVVNL (Agra), PuVVNL (Varanasi), and KESCO (Kanpur).
⚡

Consumer Details

Instant accurate estimation
🗓️
Monthly Billing Cycle (30 Days) UPERC statutory calendar month meter reading across all 5 DISCOMs
Monthly (1 Mo)
⚡
LMV-1(a) BPL / Lifeline Connection Flat ₹50.00/month fixed charge (Sanctioned load strictly ≤ 1.0 kW).
Flat ₹50/mo
Used for calculating fixed demand charges (₹/kW).
BPL connections are legally locked to Single Phase.
Meter Reading Calculator
Estimated Total
₹ approx.

Avg cost: •

Base Energy Charges
Fixed / Demand Charges
Government Lifeline Subsidy

📊 Slab-by-Slab Calculation Breakdown

Progressive / Flat
💡 UPERC 2026 Domestic Tariff Structure: Progressive telescopic slab rates apply for LMV-1 Domestic connections across Uttar Pradesh.
Urban: 0-150u @ ₹5.50 • 151-300u @ ₹6.00 • 301-500u @ ₹6.50 • 501+u @ ₹7.00 Rural: 0-100u @ ₹3.35 • 101-150u @ ₹3.85 • 151-300u @ ₹5.00 • 301-500u @ ₹5.50 • 501+u @ ₹6.00 BPL: ≤100u @ ₹3.00 (Flat ₹50/mo)
💡 UPERC 2026 Commercial (LMV-2) Tariff Structure: Commercial / Non-Domestic rates for shops, offices, and commercial establishments across Uttar Pradesh.
Load ≤ 4 kW: 0–300u @ ₹7.50 • 301+u @ ₹8.40 (Telescopic) • Fixed ₹330/kW/mo Load > 4 kW: All units @ ₹8.75 (Flat Rate) • Fixed ₹450/kW/mo Duty: 5% on Energy Charges
Slab Range Units Rate Amount
Total Energy Charges
Applicable Fixed Charges & Duties:
⚠️
Official Disclaimer: This calculator provides an estimated electricity bill based on the latest tariff information available in our database. Actual bills may vary depending on taxes, subsidies, fixed charges, arrears, meter type, billing cycle, fuel adjustments, and other applicable charges.
📋

How to Use the UPPCL Bill Calculator

Follow these simple steps to calculate your exact electricity bill in seconds.

📸 Step-by-Step Visual Walkthrough (Click image to zoom)
UPPCL Bill Calculator Step 1 tariff classification selection screenshot
🔍 Click to Expand
Step 1
Step 1: Select UPPCL Tariff Classification Select LMV-1(c) Urban Domestic, LMV-1(b) Rural Domestic, LMV-1(a) BPL Lifeline, or LMV-2 Commercial tariff.
UPPCL Bill Calculator Step 2 units consumption and load demand screenshot
🔍 Click to Expand
Step 2
Step 2: Input Monthly Consumption & Load Demand Specify monthly power consumption (units / kWh) and sanctioned electrical load in kW to calculate telescopic slabs.
UPPCL Bill Calculator Step 3 itemized bill receipt with duty screenshot
🔍 Click to Expand
Step 3
Step 3: Check Itemized UPERC Bill Receipt View itemized charges breakdown including slab energy cost, fixed demand charges (₹110/kW), and 5% UP State Electricity Duty.

🖼️

1

Select Domestic Area (Urban vs Rural)

Choose LMV-1(c) Urban for municipal towns and cities (Noida, Ghaziabad, Lucknow, Kanpur) or LMV-1(b) Rural for gram panchayat and village connections.

2

Input Sanctioned Connected Load (kW)

Enter your sanctioned load in kilowatts (e.g. 2 kW or 4 kW). Urban UPPCL consumers pay ₹110 per kW per month in mandatory fixed demand charges.

3

Enter Total Monthly Billed Units (kWh)

Input total electricity units consumed. The engine divides units across official telescopic slabs (0-150, 151-300, and 300+ units for urban connections).

4

Review Itemized Slab Math & 5% UP Duty

Inspect the detailed invoice displaying tiered energy charges, fixed demand fees, the 5% Uttar Pradesh statutory electricity duty, and total payable amount.

⚡ Official UPERC Tariff Order for State DISCOMs (Order dated 02 July 2026)

Understanding UPPCL Electricity Bill Calculation Logic (2026)

Electricity distribution across Uttar Pradesh is administered by UPPCL (Uttar Pradesh Power Corporation Limited) under the statutory oversight of the Uttar Pradesh Electricity Regulatory Commission (UPERC). Under the latest official UPERC Tariff Order for Aggregate Revenue Requirement (ARR) and Retail Tariff for FY 2026-27 (Order dated 02 July 2026), the commission approved a zero-tariff hike (existing rates retained) to safeguard domestic households and agricultural consumers from inflationary pressures. A single uniform retail tariff applies identically across all five state distribution companies: PVVNL (Meerut), MVVNL (Lucknow), DVVNL (Agra), PuVVNL (Varanasi), and KESCO (Kanpur).

1. Area-Based Tariff Structure: Urban vs Rural Metering

A distinctive hallmark of the Uttar Pradesh electricity framework is the clear demarcation between Urban and Rural domestic consumers. Each classification has its own dedicated progressive slab structure and sanctioned load demand charges:

LMV-1(c) Domestic Urban (City / Municipal): Applies to municipal corporations and urban civic areas. Features 4 progressive slabs (₹5.50 to ₹7.00/unit) with a monthly sanctioned load demand charge of ₹110.00 / kW / month.
LMV-1(b) Domestic Rural (Metered Rural): Applies to metered rural consumers. Features 5 subsidized slabs starting at ₹3.35/unit up to ₹6.00/unit, with a lower demand charge of ₹90.00 / kW / month.

2. Official Domestic Tariff Slabs (Verified 2026 Schedule)

LMV-1(c) Urban Domestic Slabs Fixed ₹110/kW/mo
Monthly Slab Range Energy Rate (₹/unit) Billing Type
0 – 150 units ₹5.50 Telescopic (Base)
151 – 300 units ₹6.00 Telescopic (Next 150u)
301 – 500 units ₹6.50 Telescopic (Next 200u)
Above 500 units ₹7.00 Telescopic (All remaining)
LMV-1(b) Rural Domestic Slabs Fixed ₹90/kW/mo
Monthly Slab Range Energy Rate (₹/unit) Billing Type
0 – 100 units ₹3.35 Telescopic (Base)
101 – 150 units ₹3.85 Telescopic (Next 50u)
151 – 300 units ₹5.00 Telescopic (Next 150u)
301 – 500 units ₹5.50 Telescopic (Next 200u)
Above 500 units ₹6.00 Telescopic (All remaining)
Connected Load & Electricity Duty
  • ⚡
    Demand Charge Formula: Sanctioned Load (kW) × Tariff Rate. For a 2 kW urban home: 2 kW × ₹110 = ₹220.00/month.
  • 🏛️
    Electricity Duty (5%): Under the UP Electricity (Duty) Act, exactly 5% duty is levied solely on the Total Energy Charges (excluding fixed demand charges).
  • 🗓️
    Calendar Month Cycle: Meter reading is conducted strictly once every 30 days.
BPL Lifeline & LMV-2 Commercial
  • 🛡️
    LMV-1(a) BPL Lifeline Rule: Available exclusively for sanctioned load ≤ 1 kW and consumption ≤ 100 units/month. Energy is billed at ₹3.00/unit with a flat fixed charge of ₹50.00/month. If usage exceeds 100 units, the consumer is automatically re-classified to LMV-1(c) Urban Domestic.
  • 🏢
    LMV-2 Commercial (Shops & Offices): For load ≤ 4 kW, demand charge is ₹330/kW/month (0–300u @ ₹7.50, 301+u @ ₹8.40). For load > 4 kW, demand charge is ₹450/kW/month and all units are billed at a flat rate of ₹8.75/unit.

4. Verified Official Calculation Worked Examples (Step-by-Step)

Here are 4 verified worked examples illustrating exact bill computation across Urban, Rural, BPL, and Commercial categories:

Test 1: Urban Domestic

250u, 2 kW
  • 0–150u @ ₹5.50 ₹825.00
  • 151–250u @ ₹6.00 ₹600.00
  • Total Energy Charge ₹1,425.00
  • Fixed: 2 kW × ₹110 ₹220.00
  • Duty (5% of ₹1,425) ₹71.25
Net Payable Bill ₹1,716.25

Test 2: Rural Domestic

250u, 2 kW
  • 0–100u @ ₹3.35 ₹335.00
  • 101–150u @ ₹3.85 ₹192.50
  • 151–250u @ ₹5.00 ₹500.00
  • Total Energy Charge ₹1,027.50
  • Fixed: 2 kW × ₹90 ₹180.00
  • Duty (5% of ₹1,027.50) ₹51.38
Net Payable Bill ₹1,258.88

Test 3: BPL Lifeline

80u, 1 kW
  • 80u × ₹3.00 ₹240.00
  • Total Energy Charge ₹240.00
  • Fixed Charge (Flat) ₹50.00
  • Duty (5% of ₹240) ₹12.00
Net Payable Bill ₹302.00

Test 4: LMV-2 Commercial

250u, 2 kW
  • 250u × ₹7.50 ₹1,875.00
  • Total Energy Charge ₹1,875.00
  • Fixed: 2 kW × ₹330 ₹660.00
  • Duty (5% of ₹1,875) ₹93.75
Net Payable Bill ₹2,628.75

💡 Practical Ways to Lower Your UPPCL Power Bill

1. Avoid the 300-Unit Threshold in Urban Connections: In LMV-1(c) Urban, moving from Slab 2 (₹6.00) to Slab 3 (₹6.50) and Slab 4 (₹7.00) increases your per-unit cost. Managing air conditioning temperatures at 24°C–26°C can help stay within lower brackets.
2. Sanctioned Load Right-Sizing: Ensure your connected load reflects actual peak requirements. Because fixed demand charges are billed monthly per kW (₹110/kW in Urban, ₹330/kW in Commercial), reducing excess sanctioned load saves substantial recurring charges.
3. Rooftop Solar with Net Metering: Under the PM Surya Ghar Muft Bijli Yojana, UP consumers can receive up to ₹78,000 central subsidy + ₹30,000 state subsidy for installing grid-tied solar systems up to 3 kW, reducing net grid consumption to zero.
4. Smart Meter Tracking via UPPCL Consumer App: Monitor daily consumption and peak demand on the UPPCL Smart Consumer Portal or App to avoid sudden high bill surprises at the end of the month.

Frequently Asked Questions about UPPCL Bill

Yes. The Uttar Pradesh Electricity Regulatory Commission (UPERC) determines a single unified retail tariff schedule that legally binds all five state distribution companies: Pashchimanchal (PVVNL), Madhyanchal (MVVNL), Dakshinanchal (DVVNL), Poorvanchal (PuVVNL), and Kanpur Electricity Supply Company (KESCO). Whether you live in Noida, Lucknow, Agra, Varanasi, or Kanpur, identical domestic slab rates and fixed charges apply to your connection.
Urban domestic consumers (LMV-1c) pay monthly fixed demand charges of ₹110 per kW and higher telescopic energy rates: ₹5.50 per unit for the first 150 units, ₹6.00 per unit for 151 to 300 units, and ₹7.00 per unit for units above 300. Rural domestic consumers (LMV-1b) pay lower fixed demand charges of ₹50 per kW and lower base energy rates: ₹3.35 per unit for the first 100 units, ₹3.85 per unit for 101 to 150 units, ₹5.00 per unit for 151 to 300 units, and ₹6.00 per unit above 300 units.
UPPCL bills fixed demand charges directly per kilowatt of contracted load. For an urban household with a 3 kW sanctioned connection, fixed charges are ₹330 per month (3 kW × ₹110) even if zero units of power are consumed. If newly installed 4G smart meters record peak demand exceeding your sanctioned capacity during any 15-minute interval, UPPCL levies an automatic 200% excess demand penalty on the overdrawn kilowatt capacity.
The statutory electricity duty in Uttar Pradesh is 5%, levied directly by the State Government under the Uttar Pradesh Electricity (Duty) Act, 1952. This 5% tax is calculated exclusively on total energy charges (excluding fixed demand charges). It is billed as a separate line item on your UPPCL consumer bill and is not bundled inside the base per-unit slab rates.
Under category LMV-1(a), economically weaker households holding Antyodaya or BPL ration cards with a contracted load of up to 1 kW and monthly consumption not exceeding 100 units receive heavily subsidized power. Energy is billed at ₹3.00 per unit with a concessional fixed charge of ₹50 per month. If monthly consumption crosses 100 units, the connection is automatically billed under standard LMV-1(b) or LMV-1(c) domestic rates for that billing cycle.
Smart meters continuously log maximum demand. If you run a 2,000-watt geyser, a 1.5-ton AC, and a microwave simultaneously on a 2 kW sanctioned connection, peak demand can spike to 4.5 kW, triggering penalty charges on subsequent bills. Consumers can avoid penalties by staggering heavy heating and cooling appliances or submitting a load enhancement request online through the UPPCL consumer self-service portal (e-Nivaran).