TNEB Electricity Bill Calculator 2026 – TANGEDCO Bi-Monthly Tariff Estimator
Electricity billing across Tamil Nadu is administered by TANGEDCO under tariff orders issued by the Tamil Nadu Electricity Regulatory Commission (TNERC). Unlike most Indian states that bill electricity every 30 days, Tamil Nadu calculates residential bills on a 60-day bi-monthly schedule. Under the state welfare policy, domestic households (LT-IA) receive 100 free units per month, translating to 200 free units on each 60-day bill provided total consumption stays under 500 units. If bi-monthly consumption crosses 500 units, the free allowance drops to 100 units while upper units are charged at higher rates of up to ₹8.00 to ₹10.00 per unit. In addition, apartment complexes must account for the separate LT-ID tariff for common amenities like water booster pumps and elevators. This calculator models official TNERC bi-monthly slabs to show your exact charges and subsidy entitlements.
TNERC Order No. 6 effective rates maintained under 2026 tariff freeze. Domestic 200 free units subsidy for usage <= 500 units, Commercial flat rate above 100 units.
Consumer Details
Instant accurate estimationAvg cost: •
📊 Slab-by-Slab Calculation Breakdown
Progressive / Flat| Slab Range | Units | Rate | Amount |
|---|---|---|---|
| Total Energy Charges | |||
How to Use the TNEB / TANGEDCO Bill Calculator
Follow these simple steps to calculate your exact electricity bill in seconds.
🖼️
Select Tariff Category
Choose LT-IA Domestic for individual households, LT-ID for apartment common facilities (lifts, stair lighting, water motors), or LT-V for commercial shops and clinics.
Enter 60-Day Bi-Monthly Consumption Units
Input total kilowatt-hours consumed across your two-month billing window. Check your previous meter reading date to ensure the reading covers the standard 60-day cycle.
Verify Subsidy Thresholds & Aadhaar Seeding
The calculator checks whether your usage remains below 500 units to credit the full 200 free units, or applies the reduced 100-unit allowance if consumption exceeds 500 units.
Review Itemized Slab Math & Total Payable
Inspect the slab-by-slab breakdown showing energy charges, fixed service charges, state government subsidies, and the final net amount payable to TANGEDCO.
Understanding TANGEDCO Electricity Bill Calculation Logic
Electricity billing in Tamil Nadu is governed by the Tamil Nadu Electricity Regulatory Commission (TNERC) and implemented by TANGEDCO (formerly TNEB). Following the State Government's tariff freeze order, the revised rates effective from 1 July 2025 remain active for 2026.
1. The 60-Day Bi-Monthly Billing Cycle
Unlike most Indian states that bill monthly, TANGEDCO calculates power bills for residential and small low-tension connections once every two months (60 days). This means all official slab quotas (such as the 400-unit base slab and the 500-unit subsidy threshold) apply to two months of combined consumption, not a single month.
2. Domestic (LT-IA) Slab Rates & The Free Units Subsidy Rule
TNEB domestic billing uses a progressive telescopic structure with two separate subsidy categories based on total bi-monthly consumption:
If your bi-monthly usage is 500 units or less, the first 200 units are 100% free, sponsored by the Government of Tamil Nadu (saving you up to ₹990.00). Remaining units up to 400 are billed at ₹4.95/unit, and units 401–500 at ₹6.65/unit.
Once your bi-monthly usage crosses 500 units, your free quota is reduced to 100 free units (saving ₹495.00). Units above 400 are charged under higher progressive slabs up to ₹12.15/unit.
| Slab Range (Bi-Monthly) | Energy Rate (₹/unit) | Billing Logic & Applicability |
|---|---|---|
| 0 – 400 units | ₹4.95 | Base slab. If ≤ 500u, first 200u are free (₹0). If > 500u, first 100u are free (₹0). |
| 401 – 500 units | ₹6.65 | Applicable to the next 100 units consumed above 400 units. |
| 501 – 600 units | ₹8.80 | Triggers when crossing 500 units; reduces free subsidy to 100 units. |
| 601 – 800 units | ₹9.95 | Next 200 units billed at ₹9.95 per unit. |
| 801 – 1,000 units | ₹11.05 | Next 200 units billed at ₹11.05 per unit. |
| 1,001 units & above | ₹12.15 | All remaining units above 1,000 billed at the maximum slab rate. |
3. Step-by-Step Worked Calculation Examples
Here is the exact arithmetic used by TANGEDCO for two common consumption scenarios:
Example A: 250 Units (Usage ≤ 500u)
Net: ₹247.50- Gross Units in Slab [0 – 400]: 250u × ₹4.95 ₹1,237.50
- Less: 200 Free Units Subsidy (200u × ₹4.95) −₹990.00
- Fixed Demand Charges (Waived by Govt) ₹0.00
- Electricity Duty (Exempt on Domestic LT-IA) ₹0.00
- Final Payable Amount ₹247.50
Example B: 550 Units (Usage > 500u)
Net: ₹2,590.00- Slab 1 [0 – 400]: 400 units × ₹4.95 ₹1,980.00
- Slab 2 [401 – 500]: 100 units × ₹6.65 ₹665.00
- Slab 3 [501 – 550]: 50 units × ₹8.80 ₹440.00
- Gross Energy Charge (400u + 100u + 50u) ₹3,085.00
- Less: 100 Free Units Subsidy (100u × ₹4.95) −₹495.00
- Final Payable Amount ₹2,590.00
At 500 units, your bill is ₹1,485.00 (after ₹990 subsidy). At 550 units, your bill jumps to ₹2,590.00 — an increase of ₹1,105.00 for just 50 extra units. This happens because crossing 500 units cuts your government subsidy in half (losing ₹495.00) while simultaneously charging higher rates (₹6.65 and ₹8.80) on your upper units.
4. Commercial (LT-V) & Apartment Common Facilities (LT-ID) Rules
LT-V Commercial (Shops & Offices)
Commercial connections follow a flat-rate system (non-telescopic):
- Usage ≤ 100 units: All units at ₹6.65/unit.
- Usage > 100 units: All units charged at ₹10.45 flat.
- Fixed Demand Charge: ₹110/kW/month (₹220/kW per bi-monthly bill).
- Electricity Duty: 5% on total energy charges.
LT-ID Common Facilities (Apartments)
For residential apartment common lighting, lifts, water pump motors, and security gates:
- Energy Charge: Flat rate of ₹8.55 per unit for all consumption.
- Fixed Demand Charge: ₹55/kW/month (₹110/kW per bi-monthly bill).
- Electricity Duty: 5% on total energy charges.
- Note: Individual flats remain under Domestic LT-IA.
5. How to Read Your TANGEDCO Digital Meter