Home Calculator States & DISCOMs Blog
☀️ Power Tool • Updated for 2026

Solar Rooftop Savings & ROI Calculator India 2026

Rooftop solar turns an unused terrace into a power source that offsets domestic grid electricity. Under the central PM Surya Ghar: Muft Bijli Yojana, eligible Indian households receive direct bank subsidies up to ₹78,000 for installing grid-tied systems up to 3 kW. In most parts of India, 1 kW of solar capacity generates roughly 4.0 to 4.5 units (kWh) of electricity daily, producing 120 to 135 units every month. Because daytime electricity feeds household appliances directly while surplus exports through a bi-directional net meter, expensive high-tier consumption slabs drop significantly. Factoring in equipment costs, central subsidies, and local electricity board slab rates, a typical 3 kW residential setup recovers its initial investment within 3.5 to 4.5 years, generating free power for the remaining 20 years of its panel warranty.

PM Surya Ghar: Muft Bijli Yojana • MNRE 2026
4.2 kWh / kW / Day Standard
3.0 kW (Recommended)
1 kW 3.0 kW Plant 10 kW
5.0 Hours / Day
Monsoon / Cloudy (3.5h) Indian Average (~5.0h) Peak Sunny Western India (7.0h)
Grid Slab Rate
₹ per Unit (kWh)

Direct Benefit Transfer (DBT) into consumer bank accounts: ₹30,000 for 1 kW, ₹60,000 for 2 kW, and maximum ₹78,000 for ≥3 kW residential rooftop systems.

Solar ROI & Generation 25-Year Life
Estimated Monthly Savings
₹2,646 / month
Annual Savings: ₹31,752 / year
Solar Units Generated 378 kWh ~12.6 units / day
PM Surya Ghar Subsidy ₹78,000 Direct DBT to Bank
Estimated Turnkey Cost: ₹1,60,000
Govt Capital Subsidy (CFA): - ₹78,000
Net Customer Cost: ₹82,000
Estimated Payback Period 2.6 Years
25-Yr Net Free Profit ₹7,11,800
🏡
Roof Area Needed ~255 sq. ft. shadow-free
CO₂ Mitigated ~3.7 tonnes / yr
☀️

Need your exact state tariff with domestic slabs & duty?

Compare your solar rooftop generation directly against state DISCOM domestic telescopic slabs (TNEB, KSEB, BESCOM, MSEDCL, UPPCL, WBSEDCL, etc.).

Calculate with Your State DISCOM Slabs
Step-by-Step Guide

How to Use the Solar Rooftop Savings Estimator

1

Choose Solar System Capacity

Select 1 kW for homes consuming under 120 units monthly, 2 kW for 2-bedroom homes using 200 to 250 units, or 3 kW to claim the maximum ₹78,000 central subsidy and cover high summer cooling loads.

2

Estimate Available Shadow-Free Roof Area

Verify unobstructed terrace space facing south. Modern 540W mono-PERC panels require roughly 80 to 100 square feet per kilowatt of installed capacity.

3

Verify Regional Daily Sun Hours

Most Indian states average 4.5 to 5.0 effective peak sunshine hours daily across the year, accounting for monsoon cloud cover and clear winter conditions.

4

Input State Slab Rate & Net Metering Rules

Enter your DISCOM per-unit tariff (average domestic rates range from ₹6.50 to ₹8.50 per unit) to calculate monthly generation, avoided slab charges, net subsidy support, and simple payback timeline.

🖼️

Solar Rooftop Generation Physics and ROI Formulas

Solar panel energy output depends on installed capacity, local solar irradiance, and system loss factors. A standard rooftop setup operates with a Performance Ratio (PR) of 75% to 80%, accounting for inverter conversion losses (3%), summer heat degradation (8% to 10%), dust accumulation (4%), and wiring resistance (2%).

Daily Solar Generation (kWh) = System Capacity (kW) × Peak Sun Hours (h/day) × Performance Ratio (0.78)

Monthly Units Generated = Daily Solar Generation × 30 Days

Monthly Bill Savings (₹) = Monthly Units Generated × Avoided Grid Tariff Slab Rate (₹/kWh)

Net Consumer Out-of-Pocket Cost (₹) = Total EPC Installation Cost − PM Surya Ghar Central Subsidy

Simple Payback Period (Years) = Net System Cost ÷ Annual Financial Savings

Residential Rooftop Solar Benchmark: Sizing, Subsidies & Payback (1 kW to 5 kW)

Calculations reflect average tier-1 mono-PERC installations, MNRE PM Surya Ghar subsidy rules, and ₹7.00 per unit grid tariff.

Capacity Roof Area Daily Units Monthly Units Gross Cost Govt Subsidy Net Cost Monthly Saving Payback
1 kW Plant 80–100 sq ft 4.2 kWh 126 u ₹65,000 ₹30,000 ₹35,000 ₹882 3.3 Years
2 kW Plant 160–200 sq ft 8.4 kWh 252 u ₹1,25,000 ₹60,000 ₹65,000 ₹1,764 3.1 Years
3 kW Plant 240–300 sq ft 12.6 kWh 378 u ₹1,80,000 ₹78,000 ₹1,02,000 ₹2,646 3.2 Years
4 kW Plant 320–400 sq ft 16.8 kWh 504 u ₹2,35,000 ₹78,000 (Capped) ₹1,57,000 ₹3,528 3.7 Years
5 kW Plant 400–500 sq ft 21.0 kWh 630 u ₹2,85,000 ₹78,000 (Capped) ₹2,07,000 ₹4,410 3.9 Years

Real-World Rooftop Solar Case Studies Across India

Case 1: Bengaluru 2 BHK Home (BESCOM)

2 kW On-Grid System on Independent Terrace

• Prior Monthly Consumption: ~240 Units (₹1,750 bill)

• Solar Generation: 8.4 units/day (252 units/month)

• Net Bill: Fixed charges only (~₹180 to ₹220/month)

• Net Installation Cost after Subsidy: ₹65,000

• Annual Savings: ~₹18,360 | Payback in 3.5 Years

Case 2: Delhi 3 BHK with 2 ACs (BSES Rajdhani)

3 kW Plant Maximizing Free Power & Subsidy

• Summer Consumption: 480 Units/month (₹3,400 bill)

• Solar Generation: 378 units/month

• Net Grid Import: 102 units (Qualifies for Delhi 200u subsidy!)

• Net Energy Bill: ₹0 (Zero Bill achieved!)

• Annual Savings: ~₹31,000 | Payback in 3.3 Years

Case 3: Pune Bungalow (MSEDCL High Slabs)

3 kW Plant Offsetting ₹11/Unit Slabs

• Prior Consumption: 400 Units (MSEDCL tariff ₹11.50/u top slab)

• Monthly Avoided Cost: 378 units × ₹9.20 weighted avg = ₹3,477

• Net System Cost: ₹1,02,000 after ₹78,000 subsidy

• Annual Savings: ~₹41,700 | Payback in 2.5 Years!

Case 4: Chennai Suburban Home (TANGEDCO)

2 kW System with Partial Afternoon Shade

• Tree shade reduces PR to 70% (7.2 units/day avg)

• Monthly Solar Output: ~216 Units

• Bi-monthly TANGEDCO Offset: 432 units eliminated

• Annual Savings: ~₹15,100 | Payback in 4.3 Years

5 Practical Guidelines Before Installing Rooftop Solar

  • 1. Match tilt angle to your city latitude: South-facing panels tilted between 12° and 25° maximize solar irradiance across both summer and winter solstices in India.
  • 2. Wash panels twice a month in early morning: Ambient dust and pollution build-up causes a 5% to 12% drop in generation. Clean with plain water before panels heat up in the sun.
  • 3. Verify your sanctioned load before applying: Most DISCOMs mandate that solar plant capacity cannot exceed 80% to 100% of your sanctioned connected load in kW. Upgrade your load if necessary before submitting the net-metering application.
  • 4. Budget for inverter replacement at year 8 to 10: While solar panels carry 25-year performance warranties, central string inverters typically have a working lifespan of 8 to 10 years and cost 15% to 20% of the original plant cost to replace.
  • 5. Verify vendor empanelment on the National Portal: Central PM Surya Ghar subsidies are only disbursed when installation is completed by an MNRE-empanelled vendor using ALMM-listed (Approved List of Models and Manufacturers) domestic modules.
Help & Insights

Frequently Asked Questions

The central government provides ₹30,000 for 1 kW systems, ₹60,000 for 2 kW systems, and a maximum capped subsidy of ₹78,000 for systems of 3 kW and above. Some states, including Uttar Pradesh and Delhi, offer an additional state-level top-up subsidy credited separately.
Standard 540W to 550W mono-crystalline PERC panels require 80 to 100 square feet per kilowatt of capacity. A 3 kW plant needs roughly 250 to 300 square feet of unobstructed, south-facing roof area free from water tank or parapet wall shadows.
No. Standard grid-tied (on-grid) systems shut down automatically during grid outages to prevent back-feeding electricity into the utility lines, protecting line workers from electrocution. If you need backup during blackouts, you must install a hybrid solar inverter connected to a battery bank.
A bi-directional net meter records two values: units imported from the grid at night or on cloudy days, and units exported from your solar panels during peak daytime hours. At the end of each billing cycle, your DISCOM bills you only for the net difference (Units Imported minus Units Exported). If you export more than you import, surplus units roll over as bill credits to the following cycle.
During heavy monsoon months (July and August), generation drops by 40% to 55% due to cloud cover and rain. In winter, generation remains strong across western and southern India, while northern states experience a 20% to 30% reduction during dense fog periods. Over a full 12-month calendar year, these seasonal variations average out to roughly 4.2 units per kW per day.
Tier-1 solar panels carry a 10 to 12-year product warranty and a 25-year performance warranty. Standard mono-PERC panels degrade by 1.5% to 2% in the first year and roughly 0.5% each subsequent year, retaining over 80% to 84% of their original rated output at year 25. String inverters typically require replacement or servicing around year 8 to 10.